Roberts Gorden TF-120 用户手册

下载
页码 28
TF-S
ERIES
 I
NSTALLATION
, O
PERATION
 
AND
 S
ERVICE
 M
ANUAL
SECTION 5: MAJOR COMPONENTS 
FIGURE 11: Major Component Descriptions
Burner with Tube Gasket
Must be installed with the 
flame observation 
window facing down.
Reflector 
(Aluminum or 
Stainless 
Steel)
Alternate overlap as 
shown on overview and 
on Page 16, Figure 14
Minimum overlap is 6" (16 cm).
Tube and Reflector Hanger 
with Clamp Package
Position this hanger no more 
than 4" (10 cm) away from the 
burner.
Coupling Assembly 
with Lock
Reflector End Cap
Punch out center 
section to 
accommodate tube.
Tube and Reflector Hanger
Suspend system from these 
hangers.
Flex Gas Line with 
Shut Off Cock
Tube
Hot Rolled or Heat 
Treated Aluminized Tube 
Supplied in 10' (3 m) lengths.
Burner Tube
Supplied in 10
'
 
(3 m) lengths. Burner 
tube is always the first tube 
after the burner.
Reflector Support Strap & 
Wire Form
Turbulator
Turbulator must be 
installed in the last standard 
section of tube. Turbulator is 
not required on the TF-250/
300/350/380. For installation 
see Page 21, Section 7.5.
Flexible Boot
Flexible boot is used to 
connect the last tube to 
the vent.
Vent Sleeve
Vent Sleeve installed 
inside flexible boot.