Roberts Gorden TF-120 用户手册

下载
页码 28
TF-S
ERIES
 I
NSTALLATION
, O
PERATION
 
AND
 S
ERVICE
 M
ANUAL
18 
Step 7.1 Burner Tube Installation
Step 7.2 Burner Installation
7' 6" ± 1'
(229 cm ± 25 cm)
S
Hook
Burner Tube
Hanger
29"± 2"
(73 cm ± 5 cm)
NOTE:
Tubing requires a downward
slope of 1/2" (13 mm)
per 20' (6 m) away
from burner.
Weld Seam
must be to the
bottom of the tube.
Offset mounting
hole must be
to the top
Description
Part Number
Burner Tube
03051XXX
S-Hook
91907302
Tube/Reflector Hanger
03090100
Lock Washer
Gasket
Burner
Bolt
Description
Part Number
Bolt
94273914
Lock Washer
96411600
Gasket
02568200
Burner
090XXXXX