Figure 21
Examples of possible venting systems using two (2) 90° elbows.  
V is listed as minimum vertical dimensions and H1 + H2 is listed 
as total of maximum horizontal dimensions. The maximum vertical 
and horizontal distances for two (2) 90° elbows as shown in Figure 
22 is 20 feet (6.1M).
Attention:  Refer  to  Figure  19  for  additional  venting 
requirements.
Figure 22
Below Grade Installation
When it is not possible to meet the required vent terminal clearances 
of 12" (305mm) above grade level, a snorkel kit is recommended. 
It allows installation depth down to 7" (178mm) below grade level. 
The 7" (178mm) is measured from the center of the horizontal vent 
pipe as it penetrates through the wall.
Ensure the sidewall venting clearances are observed. If venting 
system is installed below ground, we recommend a window well 
with adequate and proper drainage to be installed around the 
termination area.
TYPICAL BASEMENT INSTALLATION
Figure 20
Examples of possible venting systems using one (1) 90° elbow. 
Eight (8) feet is listed as minimum vertical vent run with 20 feet 
of maximum horizontal vent run. Vertical dimensions are based on 
centerline to centerline of pipe. Horizontal dimensions are based 
on centerline of pipe to end of termination.
Firestop at
Ceiling Level
Firestop at
Ceiling Level
VENTING FIREPLACE - TOP (continued)