Enviro VENTED GAS FIREPLACE HEATER 用户手册

下载
页码 42
elbows necessary to reach from the appliance 
adapter  up  through  the  Round  Support  Box. 
Insure that all pipe and elbow connections are 
in their fully twist-locked position.
5.  Cut  hole  in  the  roof  centered  on  the  small 
hole placed in the roof from Step 2. The hole 
should  be  of  sufficient  size  to  meet  minimum 
requirements  for  Clearance  to  Combustibles, 
as  specified.  Continue  to  assemble  lengths  of 
pipe  and  elbows  necessary  to  reach  from  the 
ceiling  support  box  up  through  the  roof  line. 
Galvanized pipe and elbows may be utilized in 
the  attic,  as  well  as  above  the  roof  line.  The 
galvanized  finish  is  desirable  above  the  roof 
line, due to the higher corrosion resistance.
6.  Once the pipe sections have been joined, and 
run  up  through  the  hole  in  the  roof,  slip  an 
elbow  strap  over  the  exposed  sections,  bend 
the  support  straps  outwards,  and  push  the 
Initial Installation
QUALIFIED INSTALLERS ONLY
V
ERTICAL
 I
NSTALLATION
:
1.  Check the instructions for required clearances (air spaces) to combustibles when passing through 
ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air 
spaces with insulation.
2.  Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position 
of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small 
hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, 
mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other 
Figure 28: Wall Framing Hole for Vertical Installation. 
framing will obstruct the venting system. You may 
wish  to  relocate  the  appliance,  or  to  offset,  to 
avoid cutting load bearing members.
3.  To install the Round Support Box/Wall Thimble in 
a flat ceiling, cut a 10 inch (25.4 cm) square hole 
in the ceiling, centered in the hole drilled in Step 
2. Frame the hole as shown in Figure 29.
4.  Assemble  the  desired  lengths  of  black  pipe  and 
Vertical
Vent Cap
Roof
Truss
Insulation
Insulation
Guard
Ceiling
Rafter
Support
Collar
Storm
Collar
Roof Flashing
15 feet (4.57m)
Maximum
Vertical
Venting
Interior Wall
Surface
Insulation
Minimum
Clearance to
Combustibles
Exterior
Wall Surface
If installed
on a carpeted
surfacea hearth
is required
Figure 29: Vertical Installation. 
22