Toshiba CEILING TYPE 用户手册

下载
页码 120
– 69 –
<Ceiling Type>
Procedure
1
2
3
4
5
6
7
Description
Turn on power of the air conditioner.
The operation is not accepted for 5 minutes when power has been turned on at first time after installation,
and 1 minute when power has been turned on at the next time and after. After the specified time has
passed, perform a test operation.
Push [Start/Stop] button and change the operation mode to [COOL] or [HEAT] with [Mode] button.
Then change the fan speed to [High] using [Fan] button.
Test cooling operation
Test heating operation
Set temperature to [18°C] using [Temperature set]
Set temperature to [30°C] using [Temperature set]
button.
button.
After checking the receiving sound “Pi”, immediately
After checking the receiving sound “Pi”, immediately
push [Temperature set] button to set to [19°C]
push [Temperature set] button to set to [29°C].
After checking the receiving sound “Pi”, immediately
After checking the receiving sound “Pi”, immediately
push [Temperature set] button to set to [18°C].
push [Temperature set] button to set to [30°C].
Then repeat the procedure 
4
 → 
5
 → 
4
 → 
5
 .
After approx. 10 seconds, all the display lamps on the sensor part of wireless remote controller,
[Operation] (Green), [Timer] (Green), and [Ready] (Yellow) flash and the air conditioner starts operation.
If the lamps do not flash, repeat the procedure 
2
  and after.
After the test operation, push [Start/Stop] button to stop the operation.
2
3, 4, 5, 6  
2, 7  
Be sure to set the 
air speed to [High]
<Outline of test operation from the wireless remote controller>
Test cooling operation:
Start → 18°C → 19°C → 18°C → 19°C → 18°C → 19°C → 18°C → (Test operation) → Stop
Test heating operation:
Start → 30°C → 29°C → 30°C → 29°C → 30°C → 29°C → 30°C → (Test operation) → Stop