American Power Conversion Central Air Conditioning System 用户手册
Maintenance: Quarterly Preventive Maintenance
64
NetworkAIR IR Operation, Maintenance, and Troubleshooting
Functional tests
*
Verify the following modes of operation:
• Full cooling
• Full reheat
• Humidification
• Dehumidification
• Full cooling
• Full reheat
• Humidification
• Dehumidification
*
Verify the operation of these actuators:
• Chilled water
• Hot water reheat (optional)
• Chilled water
• Hot water reheat (optional)