Beko BK 5200 用户手册
27
Step six: neaten the pipes
1. The pipes should be placed along the wall,
bent reasonably and hidden possibly. Min.
semidiameter of bending the pipe is 10cm.
bent reasonably and hidden possibly. Min.
semidiameter of bending the pipe is 10cm.
2. If the outdoor unit is higher than the wall
KROH\RXPXVWVHWD8VKDSHGFXUYHLQWKH
pipe before pipe goes into the room, in
order to prevent rain from getting into the
room.
KROH\RXPXVWVHWD8VKDSHGFXUYHLQWKH
pipe before pipe goes into the room, in
order to prevent rain from getting into the
room.
Ɣ7KHWKURXJKZDOKHLJKWRIGUDLQKRVH
VKRXOGQ WEHKLJKHUWKDQWKHRXWOHW
pipe hole of indoor unit.
VKRXOGQ WEHKLJKHUWKDQWKHRXWOHW
pipe hole of indoor unit.
Ɣ6ODQWWKHGUDLQKRVHVOLJKWO\GRZ
QZDUGV7KHGUDLQKRVHFDQ WEH
FXUYHGUDLVHGDQGÀXFWXDQWHWF
QZDUGV7KHGUDLQKRVHFDQ WEH
FXUYHGUDLVHGDQGÀXFWXDQWHWF
Ɣ7KHZDWHURXWOHWFDQ
WEHSODFHG
in water in order to drain smoothly.
in water in order to drain smoothly.
Installation of outdoor unit
U-shaped curve
wall
drain hose
the drain hose
can't raise
upwards.
upwards.
The drain hose can't be fluctuant
The drain hose
can't be fluctuant
can't be fluctuant
The water
outlet can't be
fluctuant
outlet can't be
fluctuant
The water outlet
can't be placed
in water
can't be placed
in water
Note:
2. Fix the power connection wire and signal control wire with wire clip (only for
cooling and heating unit).
cooling and heating unit).
Note:
Ɣ$IWHUWLJKWHQWKHVFUHZSXOOWKHSRZHUFRUGVOLJKWO\WRFKHFNLILWLV¿UP
Ɣ1HYHUFXWWKHSRZHUFRQQHFWLRQZLUHWRSURORQJRUVKRUWHQWKHGLVWDQFH
Ɣ$IWHUWLJKWHQWKHVFUHZSXOOWKHSRZHUFRUGVOLJKWO\WRFKHFNLILWLV¿UP
Ɣ1HYHUFXWWKHSRZHUFRQQHFWLRQZLUHWRSURORQJRUVKRUWHQWKHGLVWDQFH