IDEAL INDUSTRIES H CXSi 180/H 用户手册
GENERAL
6
Concord CXSi/H -
Installation & Servicing
POSITION OF BOILER
Minimum clearances required from walls or other fixed
objects to allow for the free access of combustion air are
shown in Table 3 above.
objects to allow for the free access of combustion air are
shown in Table 3 above.
Any combustible material adjacent to the boiler and its flue
system must be so placed or shielded as to ensure that its
temperature does not exceed 65
system must be so placed or shielded as to ensure that its
temperature does not exceed 65
0
C (150
0
F).
1
Graph 2 - Hydraulic Resistance
CXSi
180
/H
CXSi
160
/H
CXSi
110/H
CXSi
120
/H
CXSi
140/H
Con
1900
Boiler Size
CXSi 110/H
CXSi 120/H
CXSi 140/H
CXSi 160/H
CXSi 180/H
Front clearance
mm (in)
700 (27
1/2
)
Rear clearance
mm (in)
200 (8)
Side clearance
mm (in)
100 (4) - not including clearance for side fitted flow header
Dimension A
mm (in) 1036 (40
3/4
) 1036 (40
3/4
)
1036 (40
3/4
)
1086 (42
3/4
)
1140 (45)
Dimension B
mm (in)
175 (7)
175 (7)
175 (7)
197 (7
3/4
)
250 (10)
Dimension C
mm (in) 1107 (43
3/4
)
1107 (43
3/4
)
1230 (48
1/2
)
1353 (53
1/4
)
1476 (58
1/8
)
Dimension D
mm (in)
816 (32
1/8
)
816 (32
1/8
)
939 (37)
1062 (42
3/4
)
1185 (46
5/8
)
Dimension E
mm (in)
553 (21
3/4
)
553 (21
3/4
)
615 (24
1/4
)
676 (26
5/8
)
738 (29)
Dimension F
mm (in)
220 (8
5/8
)
220 (8
5/8
)
220 (8
5/8
)
220 (8
5/8
)
320 (12
1/2
)
2
CLEARANCES & DIMENSIONS
Table 3
Graph 1 - Heat Load / Water Volume
CXSi
180/H
CXSi
160/H
CXSi
110/H
CXSi
120/H
CXSi
140/H
Con
1898
Con
1899
+:5E
C O N C O R D
Return Rc
(2" BSP)
157294-3.pmd
11/8/2005, 9:58 AM
6