Crown Boiler BWC150 用户手册

下载
页码 26
2
3
TABLE 1.1: SUMMARY  OF HORIZONTAL VENTING OPTIONS 
VENT OPTION #
1
2
3
4
CLASSIFICATION USED IN THIS 
MANUAL
HORIZONTAL
 TWIN PIPE 
HORIZONTAL
 TWIN PIPE
HORIZONTAL
 TWIN PIPE
HORIZONTAL
 TWIN PIPE
ILLUSTRATED IN FIGURE
1.2 
1.3
1.4
1.4
VENT PIPE PENETRATION 
THROUGH STRUCTURE 
WALL
WALL
WALL
WALL
AIR INTAKE PIPE PENETRATION 
THROUGH STRUCTURE
WALL
WALL
WALL
WALL
VENT PIPE SIZE
3”
3”
3”
4”
AIR INTAKE PIPE SIZE
3”
3”
4”
4”
MAXIMUM  LENGTH 
VENT
BWC070
100ft
100ft
BWC090
100ft
100ft
BWC120
100ft 
100ft
BWC151
100ft
100ft
BWC150
55ft
BWC225
55ft
INLET
BWC070
100ft
100ft
BWC090
100ft
100ft
BWC120
100ft
100ft
BWC151
100ft
100ft
BWC150
60ft
BWC225
60ft
MINIMUM  LENGTH
VENT
BWC070
2ft
2ft
BWC090
2ft
2ft
BWC120
2ft
2ft
BWC151
2ft
2ft
BWC150
2ft
BWC225
2ft
INLET
BWC070
2ft
2ft
BWC090
2ft
2ft
BWC120
2ft
2ft
BWC151
2ft
2ft
BWC150
2ft
BWC225
2ft
VENT TERMINAL
TEE (Note #1)
CROWN 
PN 
230873
 
CONCENTRIC 
TERMINAL
TEE (Note #1)
TEE (Note #1)
AIR INTAKE TERMINAL
TEE (Note #1)
TEE (Note #1)
TEE (Note #1)
VENT MATERIAL
CPVC + PVC 
(Note #2)
CPVC + PVC 
(Note #2)
CPVC + PVC 
(Note #2)
CPVC + PVC 
(Note #2)
AIR INTAKE MATERIAL
PVC
PVC
PVC
PVC
Note #1: TEEs may be offset on snorkels as shown in Figure 1.10
Note #2: First 30” and Elbow connected to boiler must be CPVC. Downstream vent pipe can be PVC, except as noted in text.