Crown Boiler 24-12 用户手册

下载
页码 90
52
the drain cocks at boiler and in return main and 
feed water slowly up to normal level in boiler.  
Turn on burner and allow boiler to steam for 
10 minutes then turn off burner.  Draw off one 
quart of water from bottom gauge glass fitting 
and discard.  Draw off another quart sample and 
if this sample is not clear, repeat the cycle of 
draining the boiler and return main and refilling 
the boiler until sample is clear. 
f.  If the boiler water becomes dirty again at a later 
date due to additional sediment  loosened up in 
the piping, close gate valve in Hartford Loop, 
open drain cock in return main, turn on burner 
and allow condensate to flow to drain until it has 
run clear for at least 30 minutes while feeding 
water to boiler so as to maintain normal water 
level.  Turn off burner, drain boiler, open gate 
valve in Hartford Loop, then repeat step (1) 
above.
5.  Make pH or Alkalinity Test.
  After boiler and system have been cleaned and 
refilled as previously described, test the pH of the 
water in the system.  This can easily be done by 
drawing a small sample of boiler water and testing 
hydrion paper which is used in the same manner 
as litmus paper, except it gives specific readings.  
A color chart on the side of the small hydrion 
dispenser gives the reading in pH.  Hydrion paper 
is inexpensive and obtainable from any chemical 
supply house or through your local druggist.  The 
pH should be higher than 7, but lower than 11.  Add 
some appropriate water treatment chemicals,  if 
necessary to bring the pH within the specified range.
6.  Boiler is now ready to be put into service.
L.
  BOILER AND SYSTEM CLEANING - WATER 
BOILERS
1.  Filling of Boiler and System --- General --- In a hot 
water heating system, the boiler and entire system 
(other than the expansion tank) must be full of water 
for satisfactory operation.  Water should be added to 
the system until the boiler pressure gauge registers 
normal system design operating pressure.  To insure 
that the system is full, water should come out of all 
air vents when opened.
2.  Boiling Out of Boiler and System.  The oil and 
grease which accumulate in a new hot water boiler 
can be washed out in the following manner.
a.  Remove safety relief valve using extreme care to 
avoid damaging it.
b.  Add an appropriate amount of recommended 
boilout compound. 
c.  Reinstall safety relief valve.
d.  Fill the entire system with water.
e.  Start firing the boiler.
f.  Circulate the water through the entire system.
g.  Vent the system, including the radiation.
h.  Allow boiler water to reach operating 
temperature, if possible.
i.  Continue to circulate the water for a few hours.
j.  Stop firing the boiler.
k.  Drain the system in a manner and to a location 
that hot water can be discharged with safety.
l.  Remove plugs from all available returns and 
wash the water side of the boiler as thoroughly as 
possible, using a high-pressure water stream.
m. Refill the system with fresh water.
3.  Add appropriate boiler water treatment compounds 
as recommended by your local qualified water 
treatment company.
4.  Make pH or Alkalinity Test.
  After boiler and system have been cleaned and 
refilled as previously described, test the pH of 
the water in the system.  This can easily be done 
by drawing a small sample of boiler water and 
testing  with hydrion paper which is used in the 
same manner as litmus paper, except it gives 
specific readings.  A color chart on the side of the 
small hydrion dispenser gives the reading in pH.  
Hydrion paper  is inexpensive and obtainable from 
any chemical supply house or through your local 
druggist.  The pH should be higher than 7 but lower 
than 11.  Add some appropriate water treatment 
chemicals, if necessary to bring the pH within the 
specified range.  With this lower level of protection, 
care must be exercised to eliminate all of the free 
oxygen in the system.  
5.  Boiler is now ready to be put into service.