Crown Boiler BWC150/225 用户手册

下载
页码 22
19
8) Condensate Drain Line - In systems where a concentric vent is used, all condensate which forms in the boiler or 
vent system collects in both the condensate vent adapter and the sump under the heat exchanger and leaves the 
boiler through the condensate trap. This trap allows condensate to drain from the boiler and vent while retaining 
fl ue gases.  A length of corrugated drain hose is supplied with the boiler and is connected to the trap as shown 
in Figure 1.15. This hose may be routed through the back of the boiler or to the left side through the knockout 
provided. Route this hose to a drain or other suitable point for disposal. Note the following when disposing of the 
condensate:
 
 
a)   If the condensate drain line must be extended, construct the extension from PVC or CPVC pipe. Insert the  
 
 
 
hose provided with the boiler into the end of the extension as shown in Figure 1.15.
 
 
b)   Condensate is slightly acidic. Do not use metallic pipe or fi ttings in the condensate drain line. Do not route  
 
 
 
the drain line through areas that could be damaged by leaking condensate.
 
 
c)   Some jurisdictions may require that the condensate be neutralized before being disposed of. Dispose of  
 
 
 
condensate in accordance with local codes.
 
 
d)   Do not route, or terminate, the condensate drain line in areas subjected to freezing temperatures. 
 
 
e)   If the point of condensate disposal is above the trap, it will be necessary to use a condensate pump to   
 
 
 
move the condensate to the drain. In such cases, select a condensate pump that is approved for use  
 
 
 
 
with condensing furnaces. If overfl ow from this pump would result in property damage, select a pump   
   with 
an 
overfl ow switch and use this switch to shut down the boiler.  Alternatively, if heat is a necessity,  
   use 
the 
overfl ow switch to trigger an alarm.
 
 
f)   Do not attempt to move the trap from the location shown in Figure 1.15. Do not attempt to substitute    
 
 
 
another trap for the one provided with the boiler.
 
 
g)   The vent shown in Figure 1.15 must be left open for the trap to work properly.
FIGURE 1.15: CONDENSATE DRAIN LINE ASSEMBLY