Regency U39-LP1 用户手册

下载
页码 44
Regency
®
 U39 ULTIMATE Direct Vent Freestanding Gas Stove
19
Diagram 10
Diagram 9
Diagram 8
Diagram 7
Diagram 6
7)  Install the Wall Thimble in the center of the 
10" square and attach with wood screws.
8)  Slide the decorative wall thimble up to the 
wall surface being careful not to scratch the 
paint and attach with screws provided. Apply 
decorative brass or chrome trim if desired. 
See diagram  7.
DURA-VENT VERTICAL 
TERMINATIONS
3)  To install the Round Support Box/Wall 
Thimble in a fl at ceiling, cut a 10 inch 
square hole in the ceiling centred on the 
hole drilled in Step 2. Frame the hole as 
shown in diagram 10.
Diagram 5
Note: 
If installing termination on a siding  
 
covered wall, a vinyl siding standoff  
 
or furring strips must be used to  
 
ensure that the termination is not  
 
recessed into the siding. The four  
 
wood screws provided should be  
 
replaced with appropriate fasteners  
 
for stucco, brick, concrete, or other  
 
types of sidings.
5)  Before connecting the horizontal run of vent 
pipe to the vent termination, slide the black 
decorative wall thimble cover over the vent 
pipe, then slide the Wall Thimble (Part # 
942) over the vent pipe.
6)  Slide the appliance and vent assembly 
towards the wall carefully inserting the 
vent pipe into the vent cap assembly. It is 
important that the vent pipe extends into 
the vent cap a suffi cient distance so as to 
result in a minimum pipe overlap of 1-1/4 
inches. Secure the connection between the 
vent pipe and the vent cap by attaching the 
two sheet metal strips extending from the 
vent cap assembly into the outer wall of the 
vent pipe. Use the two sheet metal screws 
provided to connect the strips to the pipe. 
Bend any remaining portion of the sheet 
metal strip back towards the vent  cap, so 
it will be concealed by the decorative wall 
thimble cover. See diagram 6.
4)  If installing the vent termination to a wall with 
vinyl siding, the Vinyl Siding Standoff must 
be used. Attach the Vinyl Siding Standoff to 
the Horizontal Vent Termination, but fi rst run 
a bead of non-hardening mastic around its 
outside edges, so as to make a seal between 
vent cap and the standoff. Install the Vinyl 
Siding Standoff (Part # 950) between the 
vent cap and the exterior wall and attach 
with the four wood screws provided. Seal 
around the Vinyl Siding Standoff on all four 
sides. Diagram 5.   The arrow on the vent 
cap should be pointing up.
 Insure that the 
1-1/4" clearances to combustible materials 
are maintained. See diagram 5.
Below Grade Installation
If the Snorkel Termination must be installed 
below grade, i.e. basement application, proper 
drainage must be provided to prevent water from 
entering the Snorkel Termination. Refer to Dia. 
4. Do not attempt to enclose the Snorkel within 
the wall, or any other type of enclosure.
Diagram 4
INSTALLATION
1) M a i n t a i n   t h e   1 - 1 / 4 " 
clearances (air spaces) to 
combustibles when passing 
through ceilings, walls, 
roofs, enclosures, attic 
rafter, or other nearby 
combustible surfaces. 
Do not pack air spaces 
with insulation. Check 
the "Rigid Pipe Venting 
Arrangments" section for 
the maximum vertical rise of 
the venting system and the 
maximum horizontal offset 
limitations.
2)  Set the gas appliance 
in its desired location. 
Drop a plumb bob down 
from the ceiling to the 
position of the appliance 
fl ue exit, and mark the 
location where the vent 
will penetrate the ceiling. 
Drill a small hole at his point. Next, drop a 
plumb bob from the roof to the hole previously 
drilled in the ceiling, and mark the spot where 
the vent will penetrate the roof. Determine 
if ceiling joists, roof rafters or other framing 
will obstruct the venting system. You may 
wish to relocate the appliance or to offset, 
as shown in diagram 9 to avoid cutting load 
bearing members.