Enviro EF3 用户手册

下载
页码 43
21
Installation
10. The pipe must extend at least 12” (30 cm) away from the building. If necessary, bring another length 
of pipe (PL type) to the outside of the home to connect to the first section. Do not forget to place 
high temperature silicone around the pipe that passes through the thimble.
11. Install a vertical pipe, or if all requirements for direct venting are met, install vent termination. The 
stainless steel cap termination manufactured by the vent manufacturer is recommended. However, 
when the vent terminates several feet above ground level and there are no trees, plants, etc. within 
several feet, a 45° elbow can be used as termination. The elbow must be turned down to prevent 
rain from entering. 
NOTE:
• Some horizontal through wall installations may require a “T” and 3 to 5 feet (91 to 152 cm) of vertical 
pipe outside the building to help naturally draft in the unit. 
• This may be required if a proper burn cannot be maintained, after the stove has been tested and the 
airflow set. 
• This is due to the back pressure in the exhaust caused by airflow around the structure.
•  All  sections  of  pipe  must  have  three  (3)  screws  evenly  spaced  and  all  horizontal  and  vertical  vent 
sections located within the house must have a bead of high temperature silicone installed on the male 
end of the pipe before installation to create a gas tight seal.
T
HROUGH
 W
ALL
 W
ITH
 V
ERTICAL
 R
ISE
 
AND
 H
ORIZONTAL
 T
ERMINATION
 I
NSTALLATION
 - F
REESTANDING
:
A  45°  elbow  with  a  rodent  screen  may  be  used  in  place  of  the  termination  cap  (or  stainless  steel 
termination hood).
Figure 25  is the recommended installation set up.
Figure 26 is the installation to use if there is a concrete or retaining wall in line with exhaust vent on 
a pellet stove. The termination must be 12” (30 cm) from the outside wall and 12” (30 cm) above the 
ground. 
Wall framing
Wall thimble
Termination cap
Vertical section
of vent pipe
Horizontal frame
for thimble
Clean out tee
90° elbow
ENVIRO EF3
Concrete Wall
Wall framing
Wall thimble
Termination cap
Vertical section
of vent pipe
Horizontal frame
for thimble
Clean out tee
90° elbow
ENVIRO EF3
Wall strap
Figure 25: Venting horizontally with rise. 
Figure 26: Venting with concrete wall behind unit .