Lightolier IS:2000LV-A 产品宣传页

下载
页码 2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                                        
 
READ AND UNDERSTAND THESE INSTRUCTIONS  
BEFORE INSTALLING LUMINAIRE. 
This luminaire is intended for installation in accordance with the National Electrical Code and local regulations.  
To assure full compliance with local codes and regulations, check with your local electrical inspector before 
installation.  To prevent electric shock, turn off electricity at main power supply before proceeding. 
Retain these instructions for maintenance reference.
INSTALLATION PROCEDURE FOR: LYTECASTER® 2000LV, 2000LVE1, & 2000LVE2 LOW VOLTAGE 
FRAME-IN KITS 
CAUTION: 
USE ONLY WITH REFLECTOR TRIMS PROVIDED BY LIGHTOLIER.  USE OF OTHER MANUFACTURER’S TRIMS 
MAY VOID THE UNDERWRITERS LABORATORIES LISTING AND COULD CONSTITUTE A FIRE HAZARD.
 
INSTRUCTION SHEET NO.
IS:2000LV-A
S0607 
Page 1 of 2 
 COMPANY
 
631 Airport Road, Fall River, MA 02720 
CAUTION: 
BEFORE INSTALLING FRAME-IN KIT AND REFLECTOR TRIM, READ ALL MARKINGS ON FRAME-IN KIT AND  
REFLECTOR TO DETERMINE LAMP WATTAGE AND TYPE APPLICABLE FOR YOUR INSTALLATION. 
 
WARNING
— (RISK OF FIRE) 
DO NOT INSTALL INSULATION WITHIN 3 INCHES OF FIXTURE SIDES OR WIRING 
COMPARTMENT, NOR ABOVE FIXTURE IN SUCH A MANNER TO ENTRAP HEAT.
1.   FRAME- IN AND WIRE-IN (Fig. A)
Fasten MOUNTING FRAME to wood joist. Line up bottom edge of   
ADJUSTABLE MOUNTING BAR with bottom of wood joist (Fig. E). Wire to 
supply leads. (For Cable, use built-in Cable Clamp in J-Box). WHITE 
FIXTURE LEAD to NEUTRAL SUPPLY LEAD. BLACK FIXTURE LEAD to 
HOT SUPPLY LEAD (120V). BARE FIXTURE WIRE to SUPPLY GROUND 
(2000LV only). Use wirenuts (local hardware item). Place all electrical 
connections in the J-BOX. Attach J-BOX COVER onto J-BOX. 
 
NOTE:
 ADJUSTABLE MOUNTING BARS can be extended for 
24” mounting. For suspended ceiling, make certain that the 
bottom of MOUNTING FRAME is no higher than 1” above 
ceiling line (Fig. F) 
 
2.  CLOSE- IN (Fig. B) 
Install plasterboard, or any other dry type ceiling, as required. Hole in board 
must be cut either on the ground or after the board is nailed to the ceiling, 
using MOUNTING FRAME opening as a cutting guide. (Make sure ROTO-
CLIPS are rotated out of hole area to be cut.) (Fig. G) 
 
* Lightolier offers a hole cutter (HC-356) that can be purchased separately 
to assist with quick, clean trim installations. In this case, follow the hole 
cutting directions supplied with HC-356. 
 
3.  SNAP-IN (Fig. C).            
                                        
 
4.  PUSH- UP (Fig. D).  
 
NOTE: 
For wet plaster ceiling, use Plaster Ring Accessory      
No.1959 (order separately).
 
SEE SEPARATE 
REFLECTOR TRIM 
INSTRUCTION SHEETS 
SEE BACK PAGE FOR LAMPING INSTRUCTIONS.