Lightolier IS:409DK 产品宣传页

下载
页码 1
READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING LUMINAIRE 
This luminaire is intended for installation in accordance with the National Electrical Code and local regulations.   
To assure full compliance with local codes and regulations, check with your local electrical inspector before  
installation.  To prevent electric shock, turn off electricity at fuse box before proceeding. 
Retain these instructions for maintenance reference. 
IS:409DK
 
INSTRUCTION SHEET NO. 
A0404 
Page 1 of 1 
631 Airport Road, Fall River, MA 02720
COMPANY 
Note: This instruction sheet covers several luminaire styles. Powerhead assembly, lamp type, and reflector style may vary slightly from that 
shown, although installation is the same.  
INSTRUCTION SHEET FOR 9”,12”&16” PENDALYTE™ SERIES DECO SUSPENSION KIT 
CANOPY INSTALLATION (fig. 1): 
1.
Thread STUDS into CROSSBAR as shown. 
2.
Using appropriate slots in CROSSBAR, secure CROSSBAR to outlet box using OUTLET BOX SCREWS (provided with outlet box). 
3.
Make electrical connections: black POWERCORD lead to hot (black) supply lead; white POWERCORD lead to neutral (white) supply 
lead. Green POWERCORD lead is ground wire and must be connected to grounding terminal or ground lead inside outlet box. Use 
WIRE NUTS (local hardware item). Push supply leads into outlet box. Note: Refer to POWERHEAD instruction sheet for detailed 
wiring information. 
 
4.
Secure POWERCORD into CANOPY with RELIEF BUSHING. 
5.
Position CANOPY over STUDS and secure with CAP SCREWS.  
POWERHEAD INSTALLATION (fig. 2): 
Note: On 9” unit MOUNT PLATE must be oriented correctly to clear DOOR SCREW head 
(see fig. 2).
 
1.
Pass POWERCORD through relief bushing hole in MOUNT PLATE. 
2.
While supporting POWERHEAD ASSEMBLY wire luminaire using WIRE NUTS (local 
hardware item): black luminaire lead to hot (black) POWERCORD lead, white luminaire 
lead to neutral (white) POWERCORD lead. Attach luminaire ground wire(s) (green and/or 
bare) to green ground wire from POWERCORD. 
3.
Height adjustment: to raise luminaire push excess POWERCORD down into 
POWERHEAD. (Make certain CABLE does not interfere with internal wiring or 
components, both POWERCORD and CABLE may be cut inside POWERHEAD. Remove 
DOOR SCREW and pull DOOR away from POWERHEAD).  
4.
Secure POWERCORD to MOUNT PLATE with RELIEF BUSHING. 
5.
Attach MOUNT PLATE to POWERHEAD with 8-32 SCREWS and plug center hole with 
SNAP-IN PLUG. 
DECO TUBE INSTALLATION (fig. 3) 
1.
Slip bottom of TUBE CLIP over TAB on bottom 
of POWERHEAD. 
2.
Pivot  top of  DECO TUBE assembly until top 
of TUBE CLIP snaps over SCRE HEADS (9” 
units) or LANCED TABS (12”&16” units). 
3.
Repeat for remaining tube assemblies 
4.
CABLES  are inserted into CABLE 
ADJUSTERS. Raise luminaire by providing 
slack in CABLE and pushing through CABLE 
ADJUSTERS. Lower luminaire by depressing 
PLUNGER. 
DIFFUSER DISC INSTALLATION (fig. 4) 
1.
Install DECO TUBE assemblies to 
POWERHEAD first. 
2.
Align holes in DISC with ends of 
DECO TUBES. 
3.
Secure with CAP NUTS. 
SNAP-IN 
PLUG 
8-32 
SCREWS 
MOUNT 
PLATE 
RELIEF 
BUSHING 
POWERHEAD 
Fig. 2 
WIRE NUT 
POWERCORD 
DOOR SCREW 
DOOR 
CAUTION: MAKE CERTAIN WIRES 
ARE NOT PINCHED BETWEEN PARTS. 
CAUTION: MAXIMUM WATTAGE AS MARKED ON LUMINAIRE 
MUST NOT BE EXCEEDED. 
DISC 
CAP NUTS 
Fig. 4 
Fig. 1 
STUDS 
OUTLET BOX  
SCREWS 
CROSSBAR 
CAP SCREWS 
CABLES 
RELIEF 
BUSHING 
WIRE NUT 
TAB 
CABLE 
ADJUSTER 
PLUNGER 
 
TUBE CLIP 
DECO 
TUBES 
Fig. 3 
SCREW HEAD / LANCED TAB