Cooper Lighting H77500QT4 产品宣传页

下载
页码 2
CAUTION:  
To avoid possible electrical shock, be sure that power supply is
turned off before installing or servicing this fixture.
STEP 1:
STEM/CANOPY MOUNT 
(
Figure 1)
• Secure canopy assembly to the outlet box with screws (included 
in the Pendant Kit).
• Attach stem to the canopy and to housing.
• Make wiring connections.
SURFACE MOUNT
• The cylindrical housing is attached to the outlet box (on ceiling) 
by using (2) mounting screws shown in 
Figure 2.
• Make wiring connections.
STEP 2: To Install Upper Reflector: Cut plastic tie wrap securing heat sink to 
bracket. Install quartz mini-can frosted lamp. Make sure the lamp 
wattage matches the markings on the heat sink. 
WARNING: DO NOT handle quartz lamps with bare hands. 
Grease from fingerprints may cause premature end of life or 
shattering of lamp.
Install heat sink to upper reflector assembly carefully guiding lamp 
into reflector opening (
Figure 3). Rotate heat sink until flanges are 
seated under retention springs(
Figure 4). Insert this completed 
assembly into the cylindrical housing until seated securely.
PORTFOLIO
Installation Instructions for H17500QT4 and H17250QT4 Commercial Surface
Cylinders and for H77500QT4 and H77250QT4 Wall Mount Cylinders
Customer First Center
1121 Highway 74 South  Peachtree City, GA 30269                 12/18/06 704244
Heat Sink
Upper Reflector
Assembly
Lamp
Reflector
Opening
Mounting Screws
Lower Reflector
Assembly
Upper Reflector
Assembly
Heat Sink and
Lamp Assembly
Housing
Pendant Kit, H836
(Sold Separately)
Figure 3
Figure 1
Figure 2