Canon RS-CL07 用户手册

下载
页码 86
Installation to flat and level Ceiling
Assembly and Installation
Preparation: 
Separate the Joint fitting from the 
Ceiling-mount bracket temporarily 
Remove four M5 screws to separate Joint
fitting from the Ceiling-mount bracket.
1
Make a hole in the ceiling
Make  a  hole  in  the  ceiling  to  install  the
Ceiling-mount bracket and cables.
● When determining the hole position, use the
supplied template sheet.
● The direction to the screen is indicated on the
template sheet.
2
Secure the Ceiling-mount bracket to 
the ceiling
Use four M13 screws, to secure the Ceiling-
mount bracket to the ceiling with the arrow
facing toward the screen.
● Before securing the Ceiling-mount bracket, be
sure to remove the template sheet.
● The M13 screws are not included in the supplied
parts. Prepare the M13 screws suitable for the
ceiling structure.
3
Attach the Base bracket to the 
projector
Secure with the supplied M4 screws (RS-
CL07: 6 pcs.; RS-CL10: 5 pcs.).
WUX10 MarkII/SX7 MarkII/SX60/X700
SX80 MarkII/SX800
Direction to the
screen
Direction to the
screen