AMX HDMI-UTPRO-0808 用户手册

下载
页码 126
Installation and Setup
25
Instruction Manual – HDMI-UTPRO-0808
Reliable Earthing (Grounding)
Reliable earthing of rack-mounted equipment should be maintained. If not using a direct connection to the branch circuit 
(e.g., plugging into a power strip), pay particular attention to supply connections.
Unpacking
The HDMI-UTPRO-0808 Kit is shipped in two boxes (one contains the HDMI UTPro and the other contains the 
HDMI-UTPRO-RX units). The invoice is sent separately; a packing slip is attached to the outside of each box.
 
The complete kit includes following items:
HDMI-UTPRO-0808 Kit (enclosure, 8 receivers, 8 desktop power supplies)
Standard US power cord (if shipped within the US)
Rack ears with 8 screws per kit

Other enclosure products as needed
The documentation includes:
 
AMX HDMI-UTPRO-0808, Twisted Pair Dist Kit Quick Start Guide
Shipping boxes are marked as “Box __ of __,” where the first blank is the box number and the second blank is the total 
number of boxes in the shipment.
Unpacking Tips
 
Before fully unpacking the enclosure, inspect the shipping box for any signs of damage
If a box is partially crushed or any sides have been broken open, notify the shipping agency immediately and 
contact your AMX representative (see the warranty at www.amx.com).
 
Once unpacking is complete, closely check the physical condition of the enclosure.
 
Collect all documentation.
Note: Please save the original shipping container and packing materials. AMX is not responsible for damage 
caused by insufficient packing during return shipment to the factory. Shipping boxes are available; contact 
your AMX representative for details.
Caution: We recommend attaching all power cords to a surge protector and/or an AC line conditioner.