Sonance BPS-1 用户手册

下载
页码 8
Page 2 of 8
Installing the BPS-1 Cabinet In New Construction 
1. Deter mine the location for the
A r c h i t e c t u r a l   S e r i e s   P a n e l
B r a c k e t / G r i l l e   a n d   i n s t a l l   i t
according to its instruction manual.
2. Deter mine the location for the
BPS-1 cabinet. 
I M P O R TA N T :   T
H E
C E N T E R
O F
P
A N E L
B
R A C K E T
S
S P E A K E R
O P E N
-
I N G
S H O U L D
B E
A P P R O X I M AT E L Y
12” 
F R O M V E N T T U B E E N D O F
BPS-1
E N C L O S U R E
(
S E E
F
I G U R E
2 ) .
M
A I N TA I N I N G
T H E
V E N T
T U B E
S
P R O P E R L E N G T H I S I N T E G R A L T O T H E
B P S - 1 ’
S A C O U S T I C P E R F O R M A N C E
.
L
E N G T H E N I N G
O R
S H O R T E N I N G
T H E V E N T T U B E T O F I T A D I F F E R E N T
D I S TA N C E W I L L A D V E R S E L Y A F F E C T T H E
B P S - 1 ’
S P E R F O R M A N C E
.  
2. Attach the included Mounting Hole Drilling Template to the ceiling joist at the BPS-1 mounting location
(see 
Figure 3). Make sure that the template is placed high enough so the BPS-1 cabinet will not 
contact the ceiling material after installation. (Contact can cause buzzing during operation.)
3. Drill eight 
5
/
16
" holes through the joist at the locations indicated on the Drilling Template (see 
Figure 3).
4. Screw the two Temporar y Installation Brackets across the underside of the joist bay at the locations
indicated on the Drilling Template (see 
Figure 4). The Temporar y Brackets have two sets of pre-drilled
holes: One for 24” center-to-center joist spacing, and another for 16” center-to-center joist spacing.
Architectural Series
BPS-1 I
N
-C
E I L I N G
S
U B W O O F E R
I
N S T A L L A T I O N
M
A N U A L
B6R
Sonance Architectural Series
5/8”
DR
YW
ALL
WWW
.SONANCE.COM
800.582.7777
12”
Joists
BPS-1 Cabinet
Panel Bracket
Figure 2: Positioning the BPS-1 Relative to the Panel Bracket
(Note: Vent tube not shown for clarity)
WA R N I N G
D O   N O T   AT TA C H   T H E   B P S - 1   T O   A N   I - J O I S T   T H AT   H A S   N O T   B E E N   A D E Q U AT E LY   B R A C E D .
D O I N G   S O   C A N   C A U S E   C O L L A P S E ,   R E S U LT I N G   I N   I N J U RY   O R   D E AT H .   C O N S U LT   W I T H   T H E
J O B ’ S   G E N E R A L   C O N T R A C T O R   B E F O R E   AT TA C H I N G   T H E   B P S - 1   T O   A N   I - J O I S T.
Temporary
Brackets
Joists
Figure 4: Attaching the Temporary Brackets 
to the Joists (16” spacing shown)
Drill Holes for
5/16” Lag Screws
Drilling
Template
Figure 3: Drilling Holes For the Lag Screws