Lucent Technologies Release 7 用户手册
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-252
ATM-SYNC (ATM Synchronization)
9
Session Restart Test (#1287)
This test is destructive.
This test attempts to restart those sessions that are down on the PPP link. The
test runs only on demand as a part of test port UUCSSpp long command.
test runs only on demand as a part of test port UUCSSpp long command.
Table 9-108.
TEST #417 Test Synchronization Test
Error
Code
Code
Test
Result
Description/ Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 3 times.
1115
ABORT
Could not allocate the necessary system resources to run this test.
2500
ABORT
Internal system error
PASS
The synchronization maintenance component circuit pack parameters have
been successfully updated. The system should be synchronized after
successful execution of this test.
been successfully updated. The system should be synchronized after
successful execution of this test.
1. If synchronization problems still exist, refer to the Error Log to obtain
information regarding the source of the problem.
Continued on next page
Table 9-109.
TEST #1287 Session Restart Test
Error
Code
Code
Test
Result
Description/ Recommendation
1125
ABORT
PPP Link is not in service.
1. Check if the PPP link is in-service or not. If the link is not in service,
release the link (release link
n or the release port UUCSSpp) and
repeat the test. This is a normal abort.
2000
ABORT
Response to the test was not received from the C-LAN circuit pack within
the allowable time period.
the allowable time period.
1. If this result occurs repeatedly, attempt to reset the circuit pack if the
other ports on the board are not in use (Yellow LED is off). Reset the
circuit pack by issuing the busyout board UUCSS and the reset
board UUCSS commands.
circuit pack by issuing the busyout board UUCSS and the reset
board UUCSS commands.
2. If this result occurs again, replace the circuit pack.
2100
ABORT
The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page