Alamo 1595 用户手册

下载
页码 102
OPERATION
1595   01/11
Operation Section 4-32
© 2011 Alamo Group Inc.
OPERA
T
ION
Make additional passes until desired depth is
reached. During each pass, use only bucket control
while working depth. This will allow you to
concentrate on controlling bucket angle to maintain
a precise cut.
LOADING LOW TRUCKS OR SPREADERS FROM A PILE
For faster loading, minimize angle of turn and
length of run between pile and spreader.
Back grade occasionally with a loaded bucket to
keep working surface free of ruts and holes. Also,
hold lift control forward so full weight of bucket is
scraping ground.