Husqvarna 115 145727 用户手册

下载
页码 17
10
ASSEMBLY
NOTE: Depending on model, it may be necessary to
drill a ¼" hole to move the upper chute latch nut.
Slide upper chute onto lower chute, lining up 
1. 
notches and channels. If latch on lower chute and 
latch nut on upper chute are aligned, skip to Step 
3.
If upper chute latch nut is not aligned to the lower 
2. 
chute bungee, drill a ¼" hole 2½" from the lower 
edge of the upper chute and in alignment with the 
lower chute latch. Move latch nut and hardware to 
new hole placement.
Stretch bungee latch up onto acorn nut on upper 
3. 
chute to secure.
6
UPPER CHUTE INSTALLATION
Before continuing to Step 7, locate the seal 
fastening kit (packed separately) and install the 
top cover grommet.
CHUTE / HOOD INSTALLATION
Push upper chute through the gasketed opening 
1. 
in the cover assembly.
Rotate chute so the chute opening is downwards 
2. 
toward the container bags.
LEVELING MOWER DECK
Be sure deck is properly leveled for best mower 
performance. See your mower operator’s manual for 
instructions.
Hood Inlet
Rotate upper chute to point 
downwards towards bags
Drill hole placement, 
if necessary