Exmark Lazer ZHP 用户手册

下载
页码 52
 
 
- 15 -
 
 
 
c)  Locate the upper u-shaped section of the roll bar.  Install the upper roll bar 
section using the two 1/2-13 x 3 1/4 capscrews from step b and two 1/2-13 
hex flange lock nuts.   Do not over tighten.  Make sure upper roll bar can 
pivot freely. 
  
 
Notes: 
 
•  Make sure the capscrew and nuts are installed with the nut to the inside of 
the roll bar. 
•  Make sure the tab on the lanyard washer is installed as shown and points 
toward the front of the unit. 
 
 
 
d)  Torque all lower roll bar hardware attached to the machine frame to 30 ft-lbs. 
(41-47 N-m).  
 
 
 
e)  Tighten the front knobs against the upper roll bar ends. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FIGURE 3 
UPPER ROLL BAR INSTALLATION 
3.3 SERVICE BATTERY
  
 
 
  
 
 
 
The machine is shipped with a filled lead acid battery. 
 
3.3.1 
Unhook seat latch and tilt seat up to gain access to the battery. 
     
DANGER 
POTENTIAL HAZARD 
♦  Charging the battery may produce explosive gasses 
WHAT CAN HAPPEN 
♦  Battery gasses can explode causing serious injury. 
HOW TO AVOID THE HAZARD 
♦  Keep sparks, flames, or cigarettes away from battery. 
♦  Ventilate when charging or using battery in an 
enclosed space. 
♦  Make sure venting path of battery is always open once 
battery is filled with acid. 
WARNING: Battery posts, terminals, and related accessories contain lead compounds, chemicals known 
to the State of California to cause cancer and reproductive harm.  Wash hands after handling.