Husqvarna M-ZT 61 /966793003 用户手册

下载
页码 20
5
ASSEMBLY
1.  Remove the discharge chute from the deck 
by removing the side hardware from the chute 
bracket. Retain the hardware for reuse if the 
collection system is removed.
2.  Lower deck to the lowest cutting position.
3.  Remove the right hand (discharge side) belt cover 
from the deck.
4.  Relieve the tension from the deck belt and remove 
the belt from the center deck pulley. 
(See Operator Manual if necessary)
5.  Remove the nut securing the right hand deck 
pulley to the spindle.
6.  Install drive pulley included in collection system 
kit on top of the current deck pulley.
7.  Reinstall the nut on the spindle and torque to 55-
75 ft/lbs.
8.  Reinstall the deck belt.
1.  Place blower assembly on secure table or stable 
surface.
2.  Remove the bolts securing the rear mount 
bracket.
3.  Using the hacksaw, trim the blower housing along 
the recessed grooves.
4.  Reinstall the rear mount bracket with previously 
removed bolts.
Mount Bracket 
Rear
Trim Line
DRIVE PULLEY
2
TRIMMING BLOWER
Belt Cover
Discharge 
Chute
Hardware
Drive Pulley
3
MOUNTING BLOWER ASSEMBLY
Outer Pulley Cover
Pin
1.  Position blower over the discharge tabs on the 
deck and set blower onto the deck.
2.  Install the front mount bracket to the deck with the 
pin and hairpin cotter supplied with the kit.