Husqvarna 155 用户手册

下载
页码 52
English – 
23
50
100
MAINTENANCE
25
WARNING!
No service procedures must be conducted on the engine or cutting unit unless:
The engine is switched off.
The ignition key is removed.
The ignition cable is removed from the plug.
The parking brake is applied.
The cutting unit is disengaged.
Maintenance schedule
The following is a list of the maintenance which should be conducted on the machine. For the items which
are not described in these instructions go to an authorised service workshop.
Daily
maintenance
before start
● = Described in these instructions.
❍ = Not described in these instructions.
Maintenance
Page
Maintenance interval
in hours
1)
 First change after 5 hours. Replace after every 25 hours with heavy loads or high temperatures.
2)
 During dusty conditions cleaning
and replacement should be more frequent. 
 3)
 For daily use of the machine lubrication should be conducted twice a week. 
4)
 Conducted
by authorised service workshop.
Check the engine’s oil level
41
Check the engine’s cooling air inlet
31
Check the fuel pump’s air filter
27
Check the steering wires
25
Check the battery
28
Check the safety system
30
Check screws and nuts
Check for fuel and oil leakage
Clean around the silencer
Check the muffler
26
Change the engine oil 
1)
41
1)
1)
Replace the air filter’s prefilter
 2)
27
Check the cutting unit
33
Check the tyre pressures 60 kPa//8.5 PSI
31
Lubricating the belt adjuster 
3)
42
Lubricate joints and shafts 
3)
42
Check the V-belts
Check the hydrostat’s cooling fins
Check the transmission’s oil level
42
Adjust the parking brakes
25
Check and adjust the throttle wire
26
Clean the engine’s and hydrostat’s cooling flanges 
2,4)
Replace the air filter’s pre-filter and paper filter 
2)
27
Replace the fuel filter
27
Replace the plug
29