Ariens 45SB 用户手册

下载
页码 35
11 
30SB, 36SB, 45SB 
Snow BEAST 
 
 
Snow BEAST  Snow Blower 
V8.10.25.12 
Step 4: Chute Direction Control Cable Support 
With the rubber lined one hole strap removed, put 
the chute direction control cable and the chute 
deflector cable into the opening, and press the 
strap together aligning the hole for the bolt. 
Secure strap to side of the engine.   
NOTE:  Rotate discharge chute and ensure there is 
no binding of any cables and there is enough slack 
in the deflector cable for full rotation.
 
Need Help With Assembly? 
(919)-550-3221 
Step 5: Drift Cutters (if desired) 
1.  The drift cutters are attached to the main housing in 
the stored position.   
2.  Remove the two bolts on each drift cutter. 
3. Reattach 
the 
drift cutters in the operating position. 
4.  Replace bolts and secure tightly. 
Step 6: Skid Shoes 
1.  Skid shoes are stored in the hardware bag for shipping.   
2.  Remove from hardware bag, and install skid shoes using the 
provided fasteners 
3.  Insert the fasteners so the flat head of the carriage bolt is 
toward the inside of the main housing. 
CAUTION:  Check the skids to ensure that the auger does 
not contact the paved or gravel surface.  Adjust skids as 
necessary to make up for wear on the snow blower. 
1.  Check the tire pressure to ensure the tires are properly 
inflated. 
2.  Move skid shoes up and down to the desired position based 
on the surface texture. 

If the surface is rougher adjust the skid shoes lower which 
increases the auger ground clearance. 

If the surfaces is smoother adjust the skid shoes higher 
(decrease ground clearance). Firmly tighten the nuts that 
secure both skids to the auger sides.