Husqvarna 5524SEB 用户手册

下载
页码 32
6
ASSEMBLY / PRE-OPERATION
INSTALL DISCHARGE CHUTE / CHUTE ROTATER 
HEAD (See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may 
be used to install the chute rotater head.
1.    Place discharge chute assembly on top of chute base 
with discharge opening toward front of snow thrower.
2.      Position chute rotater head over chute bracket.  If nec es-
sary, rotate chute assembly to align square and pin on un-
derside of chute rotater head with holes in chute brack et.
3.   With chute rotater head and chute bracket aligned, 
position chute rotater head on pin and threaded stud 
of mounting bracket.
4.   Install 3/8 washer and locknut on threaded stud and 
tighten securely.
CHECK TIRE PRESSURE
The tires on your snow thrower were overinfl ated at the fac-
tory for shipping purposes.  Correct and equal tire pres sure
is important for best snow throwing performance.
•      Reduce tire pressure to 14–17 PSI.
AUGER
CONTROL 
ROD
CONTROL 
ARM
RUBBER
SLEEVE
LOOP 
OPENING
UP
FIG. 5
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the 
spring as shown.
1.    Slide rubber sleeve up rod and hook end of spring into 
control arm with loop opening up as shown.
2.   With top end of rod positioned under right side of 
control panel, push down on rod and insert end of rod 
into hole in auger control bracket.  Secure with retainer 
spring.
AUGER
CONTROL 
LEVER
AUGER CONTROL ROD
AUGER
CONTROL 
BRACKET
RETAINER 
SPRING
FIG. 6
CHUTE
ROTATER 
HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED
STUD
PIN
ROTATER HEAD 
MOUNTING
BRACKET
CHUTE
BRACKET
FIG. 7
ALIGN BEFORE
TIGHTENING LOCKNUT