Husqvarna 524ST 用户手册
7
ASSEMBLY / PRE-OPERATION
CHECK TIRE PRESSURE
The tires on your snow thrower were overinfl ated at the fac-
tory for shipping purposes. Correct and equal tire pres sure
is important for best snow throwing performance.
tory for shipping purposes. Correct and equal tire pres sure
is important for best snow throwing performance.
• Reduce tire pressure to 14-17 PSI.
INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD
(See Fig. 7)
(See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
be used to install the chute rotater head.
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2. Position chute rotater head over chute bracket. If nec-
es sary, rotate chute assembly to align square and pin
on un der side of chute rotater head with holes in chute
brack et.
on un der side of chute rotater head with holes in chute
brack et.
3. With chute rotater head and chute bracket aligned,
po si tion chute rotater head on pin and threaded stud
of mounting bracket.
of mounting bracket.
4. Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHUTE
ROTATER
HEAD
ROTATER
HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED
STUD
PIN
ROTATER HEAD
MOUNT ING
BRACKET
CHUTE
BRACKET
BRACKET
FIG. 7