Avaya S8300 用户手册

下载
页码 370
6
Upgrading an Existing G700 with an S8300 — R2.0 to R2.x
On-site Preparation for the Upgrade
Installation and Upgrades for G700 and S8300
271
December 2003
Pre-Upgrade Tasks — If the Target S8300 is the 
Primary Controller
If the S8300 is configured as an LSP, skip to 
CAUTION:
If you are upgrading an S8300 primary controller that has LSPs registered to it, the LSPs 
must be upgraded before the primary controller. (You can use the SAT command, list 
media-gateway, to see if there are LSPs registered to the S8300.)
Perform the following procedures if you are upgrading an S8300 that is configured as a primary 
controller.
NOTE:
It is no longer necessary to disable Terminal Translation Initialization (TTI) before an 
upgrade or to enable it after an upgrade.
Clear Alarms
1
On the Maintenance Web Interface under Alarms and Notification (Alarms for R2.0), click 
View 
Current Alarms
 (Current Alarms for R2.0). 
2
If no alarms are listed, skip the next two steps.
3
If alarms are listed, click 
Clear All
4
Resolve any remaining major alarms through the Communication Manager SAT. 
Check Link Status
1
Open a SAT session.
2
Enter 
display communication-interface links
.
3
Note all administered links.
4
Enter 
status link
 
number
 for each administered link.
5
Enter 
list signaling group
.
6
Note the signaling groups listed by number.
7
For each of the signaling groups listed, enter 
status signaling group
 
number
.
8
Make a note of any links that are down. 
Record All Busyouts 
1
At the SAT prompt, type display errors and press 
Enter
2
Look for type 18 errors and record any trunks that are busied out — you will return them to their 
busy-out state after the upgrade.