Fujitsu IP-9610 用户手册

下载
页码 90
Chapter 2    Installation and Connection 
IP-9610 
16
 
 
2)  rack mounting 
a) When IP-9610 is installed in a closed or multi-unit rack, the operating 
ambient temperature inside of the rack environment may be greater than 
room ambient.    Therefore, the consideration should be given to operate in 
the environment compatible with the specifications in Appendix 2.2 
“Environment Specifications.”   
The consideration for adjustment of the air condition like air circulation 
should be given to prevent the internal rack ambient from exceeding the 
maximum operating ambient temperature of IP-9610.   
The maximum operating ambient temperature for IP-9610: 50
°C.   
 
b) The installation of IP-9610 in a rack should be such that the amount of airflow 
required for safe operation of IP-9610 is not compromised.   
IP-9610 has ventilation opening at the left and rear side.   
Do not cover or close these ventilation openings to prevent overheating.   
 
c) The mounting of IP-9610 in a rack should be such that a hazardous condition 
in not archived due to uneven mechanical loading.    To keep stability of the 
entire rack, please fix the rack to wall or floor by suitable means.   
Be careful about injury during installation of IP-9610 into rack.   
Do not install IP-9610 into your rack where IP-9610 may make the entire 
rack unstable.   
The weight of IP-9610 with the maximum configuration: 7 kg 
 
d) If IP-9610 is supplied from the power strip or the service outlet of other units, 
it may overload the power supply cord of the power strip or other units.   
Confirm that the current rating of the power strip or the service outlet 
exceeds the combined ratings of all equipment is supplying.   
The electrical rating of IP-9610: Rated 100-240 VAC, 1.70-0.71
 
A, 50/60 Hz, 
1 phase.   
 
e) The reliable earthing of the rack-mounted equipment must be maintained.  
The particular attention should be given to supply connections other than 
direct connections to the branch circuit (e.g., use of the power strips or the 
power distribution unit).   
Note: The high leakage current may flow through the power strip earthing 
conductor if all power supply cords of IP-9610 are connected to one power 
strip.    The earth connection is essential before connecting supply. If the power 
strip is not directly connected to the branch circuit, the power strip which has 
the industrial type attachment plug should be used.   
 
 
2.1.3  Air flow into and out from the device  
IP-9610 is forced air cooled.  Be sure not to block the air intake/exhaust vents.  Provide an 
adequate amount of space around the vents.