Cisco Systems IAD2430 用户手册

下载
页码 86
 
3-4
Cisco IAD2430 Series Integrated Access Devices Hardware Installation Guide
OL-4234-06
Chapter 3      Installing Cisco IAD2430 Series IADs
  Mounting Tools and Equipment
Installation Checklist
The Installation Checklist (see 
lists the tasks for installing a Cisco IAD. Print a copy of this 
checklist and mark the entries as you complete each task. For each Cisco IAD, include a copy of the 
Installation Checklist in your Site Log. 
Figure 3-1
Installation Checklist
Installation Checklist for site ______________________________________________
Cisco IAD name/serial number _____________________________________________
Mounting Tools and Equipment
Obtain the following tools and parts needed for installing a Cisco IAD2430 series IAD:
  •
Standard flat-blade screwdriver as required for attaching brackets to rack or wall.
  •
Phillips screwdriver for attaching brackets to the IAD.
  •
Mounting brackets and screws for 24-inch rack, if required.
  –
Four telco machine screws for installing the chassis in a rack (use the screw size required by the 
rack).
  •
Screws and anchors for wall mounting, if required.
 Task
  Verified by
  Date
 Background information placed in Site Log
 Environmental specifications verified
 Site power voltages verified
 Installation site prepower check completed
 Required tools available
 Additional equipment available
 Cisco IAD received
 Quick start guide received
 Regulatory compliance and safety information received
 Information packet, warranty card, and Cisco.com card received
 Software version verified
 Rack, desktop, or wall mounting of chassis completed
 Initial electrical connections established
 ASCII terminal attached to console port
 Modem attached to console port (for remote configuration)
 Signal distance limits verified
 Startup sequence steps completed
 Initial operation verified