Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-95
ANN-BD (Announcement Circuit Pack) 
10
Note:
a. For a complete description of these tests, refer to the "XXX-BD (Common 
Port Circuit Pack)" Maintenance documentation.
Angel-Speech Processor (SP) Handshake Test 
(#208)
This test checks the integrity of the communication link between the two 
processors on the Announcement circuit pack. Failure of this test indicates that 
the Speech Processor is insane and 
results in the loss of all integrated 
announcements on the circuit pack.
1.
D = Destructive, ND = Non-destructive
SAKI Test (#53) (a)
D
Table 10-34.
TEST #208 Angel-Speech Processor (SP) Handshake Test 
Error 
Code
Test 
Result
Description/ Recommendation
2000
ABORT
Response to the test request was not received within the allowable time 
period. If Error Type 1538 is present in the Error Log, follow the 
maintenance strategy recommended for this Error Type.
2100
ABORT
Could not allocate the necessary system resources to run this test.
ABORT
Internal System Error.
1. Retry the command at one-minute intervals a maximum of five times.
Continued on next page
Table 10-33.
System Technician-Demanded Tests: ANN-BD — 
Continued
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset 
Board 
Sequence
D/ND
1
Continued on next page