Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-142
ASAI-PT 
10
Level 1 Status Inquiry Test (#621)
This test determines the state of the transmission facility of a BRI port at the 
Level 1 (L1) or physical layer. L1 can be in one of two possible states: Activated 
or Deactivated.
The Activated state is the correct state for an ISDN-BRI port. In this state the 
Level 1 interface can communicate with the BRI endpoint or ASAI adjunct 
administered on this port. This test passes if the state of L1 is activated. This test 
also passes if software has taken this port out of service.
The Deactivated state indicates a problem with the ASAI circuit pack. When in 
this state, the Level 1 interface is idle and is not trying to communicate with the 
BRI endpoints or adjunct. When an ASAI port is placed in the out-of-service 
state, Level 1 is also put into the deactivated state. This could be due either to 
the system detecting a fault with the port or in response to a 
busyout port 
PCSSpp
 request.
FAIL
The Looparound test has failed.
1. If the test fails repeatedly, attempt to reset the circuit pack if the other 
ports on the board are not in use. Reset the circuit pack by issuing the 
busyout board PCSS
 and the 
reset board PCSS
 commands.
2. If the test fails again, execute 
test pkt P
 on the management terminal. If 
this fails, follow the failure procedures the in PKT-BUS section.
3. If the tests executed in Step 2 pass, the problem is local to the BRI 
board. Replace the circuit pack.
PASS
The BRI Port Local LAN Looparound test has passed.
Table 10-47.
TEST #618 BRI Port Local LAN Looparound  — 
Continued
Error 
Code
Test 
Result
Description/Recommendation
Continued on next page