Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-423
DC-POWER 
10
the AUDIX software. Instructions for powering down this unit are in the 
"DEFINITY AUDIX System Power Procedures" in Chapter 5, "Routine 
Maintenance Procedures", on the circuit pack, and in DEFINITY AUDIX 
documentation.
Error Log Entries and Test to Clear Values
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the following table. By clearing 
error codes associated with the 
Single-Carrier Cabinet Power Query Test
, for 
example, you may also clear errors generated from other tests in the testing 
sequence. Test descriptions and recommended maintenance procedures follow 
for all errors that can occur during system technician-demanded testing.
Notes:
a. Refer to “EMG-XFER” for a description of this test.
b. Refer to “EXT-DEV” for a description of this test.
1.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the 
appropriate test description and follow the recommended procedures.
1.
D = Destructive; ND = Nondestructive
Table 10-119.
Single-Carrier Cabinet Power Error Log Entries
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off
 Board
Test to Clear Value
0
1
0
Any
Any
Any
test environment P sh r 1
513
0
Single-Carrier Cabinet
MAJOR
ON
test environment P r 2
Power Query Test (#79)
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Single-Carrier Cabinet Power Query Test (#79)
X
X
ND
Emergency Transfer Query Test (#124) (a)
X
X
ND
External Alarm Lead Query Test (#120) (b)
X
X
ND
Analog Ring Generator Initialization Test (#117) (c)
X
X
ND
Analog Ring Generator Query Test (#118) (c)
X
X
ND