Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-448
DID-TRK (DID Trunk) 
10
i. Rotary dial rate above 12 pulses/sec – Less than 75 msec between two 
successive breaks.
1 – Verify trunk administered interdigit-timing parameters.
2 – Refer problem to CO.
j. Digit detection – Co is starting new rotary dial digit within 150 msec of 
previous digit.
1 – Verify trunk administered interdigit timing parameters.
2 – Refer problem to CO.
k. Loop current active – CO not releasing trunk after PBX disconnect. Occurs 
when the PBX end drops first and the CO does not release the trunk within 
four minutes.
1 – Verify the interface to the network with a hand telephone set. If calls 
are placed correctly, then refer problem to the CO.
2 – If unable to place calls or this equipment is not available, check the 
status on port using the 
status trunk
 command. If active but not 
connected, disconnect bridging clips at the network interface. Check 
status on the trunk. If trunk went idle, then replace clips. If trunk is still 
active but unable to place calls, refer problem to the CO.
l. Late CO trunk release – This event only happens after the occurrence of 
Error Type 513. The CO released the trunk four minutes after the PBX 
dropped the call. This event decrements the severity (error count) of Error 
Type 513, or may mean the problem related to Error Type 513 has been 
fixed.
1 – Verify that Error Type 513 does not occur again. Refer to Error 513.
m. Incomplete Dial timer expired. This error applies only to the TN459. 
Problem with incoming dialing stream. Refer problem to the CO.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
DID-TRK Loop Around and Conference Circuit Test,
 for example, you may also 
clear errors generated from subsequent tests in the testing sequence.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
NPE Crosstalk Test (#6)
X
ND