Lucent Technologies R5SI 用户手册
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-539
DS1-BD (DS1 Interface Circuit Pack)
10
Control Channel Looparound Test (#52)
This test queries the circuit pack for its circuit pack code and vintage and verifies
its records.
its records.
0
NO BOARD
The test could not relate the internal ID to the port (no board).
This could be due to incorrect translations, no board is inserted, an
incorrect board is inserted, or an insane board is inserted.
incorrect board is inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the
add
ds1 PCSS
command to administer the DS1 interface if it is not already
administered.
2. If board was already administered correctly, check the error log to
determine if the board is hyperactive. If this is the case, the board is
shut down. Reseating the board will re-initialize the board.
shut down. Reseating the board will re-initialize the board.
3. Issue the
busyout board
command.
4. Issue the
reset board
command.
5. Issue the
release busy board
command.
6. Issue the
test board long
command.
This should re-establish the linkage between the internal ID and the port.
Table 10-147.
TEST #52 Control Channel Looparound Test
Error
Code
Test Result
Description/ Recommendation
None
2100
2100
ABORT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Table 10-146.
TEST #50 NPE Connection Audit Test —
Continued
Error
Code
Code
Test Result
Description/ Recommendation
Continued on next page