DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-741
HYB-LINE (Hybrid Line) 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Local Digital Loop Around Test
, for example, you may also clear errors 
generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The 
NPE controls port connectivity and gain, and provides conferencing functions on 
a per port basis. The NPE Crosstalk Test verifies that this port’s NPE channel 
talks on the selected time slot and never crosses over to time slots reserved for 
other connections. If the NPE is not working correctly, one-way and noisy 
connections may be observed. This test is part of a port’s Long Test Sequence 
and takes about 20 to 30 seconds to complete.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Local Digital Loop Around Test (#58)
X
ND
NPE Crosstalk Test (#6)
X
ND
Hybrid Electronic Power Feed Test (#56)
X
ND
Hybrid Circuit and Conference Circuit 
Test (#57)
X
ND
Remote Digital Loop Around Test (#59)
X
X
ND
Station Lamp Update Test (#60)
X
X
ND
Station Audits Test (#61)
X
X
ND
Ringer Update Test (#62)
X
X
ND