DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-762
HYB-LINE (Hybrid Line) 
10
Hybrid Line Audits Test (#61)
This is a series of three tests that are classified as audits. These audits abort if 
attempted on an out-of-service station. The tests are as follows:
Switchhook Audit - This is an update of the SPE records according to the 
circuit packs’ records.
Bad Scan Inquiry - A message is sent uplink that contains a count that is 
generated due to certain events relating to the data link conditions. This is 
an indication of data transmission problems between the Hybrid circuit 
pack and the voice terminal.
EPF Inquiry - The status of the Electronic Power Feed is sent uplink. 
Possible conditions are: EPF-on-ok, EPF-off, EPF-no-load, and 
EPF-on-overcurrent.
0
NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Check to ensure that the board translations are 
correct. Use the 
list config
 command, and resolve 
any problems that are found.
2. If the board was found to be correctly inserted in 
step 1, issue the 
busyout board
 command.
3. Issue the 
reset board
 command.
4. Issue the 
release busy board
 command.
5. Issue the 
test board long
 command. This should 
re-establish the linkage between the internal ID and 
the port. If this is not the case, dispatch to check to 
ensure that there is a valid board inserted.
Table 10-212.
TEST #60 Hybrid Line Lamp Updates Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page