Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-829
ISDN-TRK (DS1 ISDN Trunk) 
10
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected 
time slot and never crosses over to time slots reserved for other connections. If 
the NPE is not working correctly, one-way and noisy connections may be 
observed. This test is usually only part of a port’s Long Test Sequence and takes 
about 20 to 30 seconds to complete.
NOTE:
The TN464C or later UDS1 circuit pack has one SCOTCH-NPE chip instead 
of several NPE chips.
1.
D = Destructive, ND = Non-destructive
Table 10-230.
System Technician-Demanded Tests: ISDN-TRK
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
NPE Crosstalk Test (#6)
X
ND
Conference Circuit Test (#7)
X
ND
Audit and Update Test (#36)
X
X
ND
Signaling Link State Check Test (#255)
X
X
ND
Service State Audit Test (#256)
X
X
ND
Call State Audit Test (#257)
X
X
ND
ISDN Test Call Test (#258)
X
ND
Continued on next page
Table 10-231.
TEST #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources required for this test are not available. The port may be in 
use on a valid call. Use 
status station
 or 
status trunk
 commands to 
determine when the port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page