Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-838
ISDN-TRK (DS1 ISDN Trunk) 
10
There are two methods available to place an outgoing ISDN-PRI test call in 
G3iV1.1-286 and G3iV2-386.
In the first method, the test call connection is established over the TDM Bus of 
the transmit and receive sides of the ISDN-PRI trunk to a data channel. This 
method is selected when no Maintenance/Test circuit pack resides in the system.
In the second method, the test call connection is established over the TDM Bus 
of the transmit and receive sides of the ISDN-PRI trunk to a digital trunk testing 
port on the Maintenance/Test circuit pack. The Maintenance/Test Digital Port 
generates a pseudo bit stream. A pictorial description of the outgoing ISDN-PRI 
test call connectivity is contained in the following figure.
Figure 10-61.
ISDN-PRI Outgoing Test Call 
Synchronous Commands
You can demand a synchronous outgoing test call by using the following 
maintenance commands:
test trunk trunk-group-no/member-no long [repeat number]
test board board-location long [repeat number]
test port port-location long [repeat number]
PI (TN765)
or
PACCON
(TN778)
NETCON SPE
D-channel Setup
B-channel
B-channel
TDM BUS
M/T
TN7771B
DS1/UDS1