Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Reliability Systems: A Maintenance Aid 
Page 6-11
Duplication Concepts 
6
SPE-Interchanges
The process by which the Standby SPE takes over for the Active SPE is referred 
to as an SPE-interchange. There are six conditions under which an 
SPE-interchange is initiated:
Upgrade Software
Issuing the 
upgrade software
 command to upgrade the software on a 
High or Critical Reliability system reboots the Standby SPE from the 
standby translation card and then invokes an SPE-interchange so that the 
system is now running on the new software.
System Technician Command
Issuing the 
reset system interchange
 command on the G3MT terminal 
causes an SPE-interchange to be initiated.
Alarm Condition
If a Major or Minor alarm is activated on any circuit pack, an 
SPE-interchange is initiated, provided the health of the Standby SPE is 
better than that of the Active SPE. 
 lists the MOs, the alarm levels, 
the level of SPE-interchange initiated, and the severity given to the alarm 
for all MOs that can cause software requested SPE-interchanges. The 
health of an SPE is based upon the single most severe alarm active within 
that SPE. The higher the severity level, the more severe the problem. The 
restart level of the interchange also depends on the single most severe 
alarm within the active SPE. Hot Restarts occur only when the Standby 
SPE is in standby mode. For example, the active SPE has a MAJOR 
SHDW-CIR and a MINOR DATA-BD alarm, and the standby SPE has a 
MAJOR TAPE alarm. In this case, the severity level of the active is 60, the 
severity level of the standby is 65, and no SPE-interchange would occur.
SPE Select Switches
An SPE-interchange can be initiated by moving both SPE Select Switches, 
one at a time
, to the position that selects the Standby SPE for Active 
Mode. The SPE Select Switches were described earlier in this chapter.
Scheduled Maintenance
An SPE-interchange can be requested as a part of scheduled 
maintenance. This mechanism is used to exercise both SPEs. An 
SPE-interchange can be requested as part of scheduled maintenance by 
issuing the 
change system-parameters maintenance
 command and 
updating the form.
Processor Insanity
Duplication Interface A (DUPINT, TN772) periodically audits the sanity of 
each of the Processor circuit packs. If the Active SPE does not respond to 
the sanity audit, Duplication Interface A initiates an SPE-interchange.