Lucent Technologies R5SI 用户手册
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-937
MMI-BD
10
Control Channel Looparound Test (#52)
Refer to the repair procedure described in the XXX-BD (Common Port Circuit
Pack) maintenance documentation as Control Channel Looparound Test (#52).
Pack) maintenance documentation as Control Channel Looparound Test (#52).
SAKI Sanity Test (#53)
Refer to the repair procedure described in the XXX-BD (Common Port Circuit
Pack) maintenance documentation as SAKI Sanity Test (#53).
Pack) maintenance documentation as SAKI Sanity Test (#53).
FAIL
The MMI circuit pack is out of MMI synchronization. Run the
long
option of the
test board
command.
1. Wait up to 5 minutes, and then reset the circuit pack with these
commands:
busyout board PCSS
, then
reset board PCSS
, followed by
release board PCSS
.
2. Rerun the test; if the same result occurs again, replace the circuit pack.
1100
PASS
The MMI circuit pack is providing the synchronization correctly. This MMI
circuit pack is designated as the Master Sync source.
circuit pack is designated as the Master Sync source.
1101
PASS
The MMI circuit pack is listening to the synchronization signal correctly.
Table 10-268.
TEST #1122/1123 MMI Synchronization
Status Test — Continued
Error
Code
Code
Test
Result
Description/Recommendation
Continued on next page