Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1096
PKT-CTRL (Packet Control Circuit Pack) 
10
k. If the specified Packet Control circuit pack is in the active SPE, it must first 
be busied-out via the 
busyout packet-control C
 command. After testing 
has been completed, the Packet Control circuit pack should be released 
from the busyout state via the 
release packet-control C
 command.
System Technician-Demanded Tests: 
Descriptions and Error Codes
When inspecting errors in the system and deciding which ones to address, 
always investigate errors in the order they are presented in the tables below. By 
clearing error codes associated with the 
Packet Control Parity Circuitry Test,
 for 
example, you may also clear errors generated from other tests in the testing 
sequence.
Packet Control Error Counter Read and Clear Test 
(#583)
This test involves reading and clearing the error counters on the Packet Control 
circuit pack. The test is performed by sending multiple maintenance requests to 
the Packet Control circuit pack and waiting for the response to each of the "read 
and clear" commands from the circuit pack.
1.
D = Destructive; ND = Nondestructive
1.
D = Destructive; ND = Nondestructive
Table 10-321.
Active PKT-CTRL
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Packet Control Reset Test (#586)
D
Packet Control Parity Circuitry Test (#584)
X
ND
Packet Control Loop Around Test (#585)
X
X
ND
Packet Control Error Counter Read and Clear Test (#583)
X
ND
Table 10-322.
Standby PKT-CTRL
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Packet Control Reset Test (#586)
X
X
ND
Packet Control Loop Around Test (#585)
X
X
ND
Packet Control Error Counter Read and Clear Test (#583)
X
X
ND