Lucent Technologies R5SI 用户手册
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1157
PR-MAINT (Maintenance Processor)
10
MTP Outpulse Relay Test (#102)
This test is a nondestructive test. The test validates the correct operation of the
remote access CO trunk used by INADS. The MTP first goes off-hook, then
on-hook on this trunk. If the loop current is detected, the test passes. This test is
not allowed if the remote access line is in use.
remote access CO trunk used by INADS. The MTP first goes off-hook, then
on-hook on this trunk. If the loop current is detected, the test passes. This test is
not allowed if the remote access line is in use.
PASS
The Maintenance/Tape Processor was reset, and it passed initialization
correctly. The other MTP tests should be examined to verify that the MTP is
functioning correctly.
correctly. The other MTP tests should be examined to verify that the MTP is
functioning correctly.
1. Enter
test processor a/b
and verify that the MTP is functioning
correctly.
Table 10-346.
TEST #102 MTP Outpulse Relay Test
Error
Code
Code
Test
Result
Description/ Recommendation
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT
Refer to STBY-SPE Maintenance documentation for a description of these
error codes.
error codes.
1018
ABORT
The test has been disabled via administration.
1. To enable the test, issue the
change system-parameters
maintenance
command, and set the test remote access port field to "y."
(If you have an INADS line, set the field to "y." If you are testing the
Standby PR-MAINT, a
Standby PR-MAINT, a
refresh spe-standby
command must be
successfully executed before you proceed to Step 2.
2. Rerun the test.
Continued on next page
Table 10-345.
TEST #101 MTP Reset Test —
Continued
Error
Code
Code
Test
Result
Description/ Recommendation
Continued on next page