Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1600
UDS1-BD (UDS1 Interface Circuit Pack) 
10
CSU Equipment Loopback Test (#1210)
This test is destructive.
The CSU Equipment Loopback (ELB) Test causes a loopback at the near-edge 
of the local AT&T 120A1 CSU Module and tests the connection from the TN464F 
 
FAIL
UDS1 Interface circuit pack failed the DS1 Board 
Loopback Test.
1. Retry the 
test ds1-loop PCSS 
ds1/csu-loopback-tests
 command.
2. If the BLB test continues to fail, then replace the 
UDS1 circuit pack.
 
PASS
The BLB test executed successfully. The test pattern 
was transmitted and received successfully up to the 
TN464F DS1 board edge.
0
NO 
BOARD
The test could not relate the internal ID to the port (no 
board). This could be due to incorrect translations, no 
board is inserted, an incorrect board is inserted, or an 
insane board is inserted.
1. Ensure that the board translations are correct. 
Execute the 
add ds1 PCSS
 command to administer 
the UDS1 interface if it is not already administered.
2. If the board was already administered correctly, 
check the error log to determine whether the board 
is hyperactive. If this is the case, the board is shut 
down. Reseating the board will re-initialize the 
board.
3. If the board was found to be correctly inserted in 
step 1, then issue the 
busyout board
 command.
4. Issue the 
reset board
 command.
5. Issue the 
release busy board
 command.
6. Issue the 
test board long
 command.
This should re-establish the linkage between the internal 
ID and the port.
Table 10-469.
TEST #1209 DS1 Board Loopback Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page