Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1654
VC-SUMPT 
10
VC Summer Port Local TDM Loopback 
Test (#1100)
This test is destructive.
This test verifies the connectivity of a VC Summer Port across the TDM bus. It 
aborts if calls associated with the port are in progress. Failure of this test 
indicates an on-board fault associated with the port hardware on the circuit pack. 
The Loopback Test runs the following tests: 
A Looparound test across the TDM bus.
A conference circuit test. 
The tests are run in the above order. If the first test fails, the switch returns an 
error code, and the second test is not executed.
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary resources to run this test. 
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL
The NPE of the tested port was transmitting in error, causing noisy and 
unreliable connections.
1. Replace the circuit pack.
PASS
The port is correctly using its allocated time slots.
1. To be sure that this is not an intermittent problem, repeat this test a 
maximum of 10 times.
2. If complaints still persist, examine the station, connections, and wiring. 
Table 10-486.
TEST #6 NPE Crosstalk Test — 
Continued
Error 
Code
Test 
Result
Description/Recommendation
Continued on next page