Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1678
XXX-BD (Common Port Circuit Pack) 
10
SAKI Sanity Test (#53)
This test is destructive.
This test resets the circuit pack.
FAIL
The test failed because the circuit pack failed to return 
the circuit pack code or vintage.
1. Retry the command for a maximum of 5 times.
2. If the test still fails, issue the 
busyout board
reset 
board
, and 
release busy board
 commands, and 
then retest.
3. If the problem continues, replace the circuit pack.
4. Run the test again.
5. If the test continues to fail, escalate the problem.
PASS
Communication with this circuit pack is successful.
EXTRA BD
This result should only appear for the TN771B or 
TN771C Maintenance/Test circuit pack. More than one 
circuit pack has been installed in this port network. 
Remove this circuit pack.
any
NO 
BOARD
This is normal if the test is being done when (a) the 
circuit pack is not physically in the system or (b) the 
system is booting up. Otherwise, there is some 
inconsistency between the physical configuration and 
the data kept in the system.
1. Verify that the circuit pack is physically in the 
system.
2. Verify that the system is not in a stage of booting up.
3. ) Retry the command at one-minute intervals for a 
maximum of five times.
4. If the test continues to return NO BOARD, escalate 
the problem.
Table 10-494.
TEST #52 Control Channel Loop Around Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page