Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-488
status periodic-scheduled 
8
Output
For the following output example, the command "status periodic-scheduled" was 
entered.
Pre - SCHEDULED 
MAINTENANCE
During scheduled maintenance, a delay of about 1 to 15 
minutes can be observed prior to the testing of System Critical 
Resources. During this period maintenance is switching those 
duplicated resources administered on the 
system-parameters 
maintenance
 screen.
Pre-scheduled maintenance also includes the time the standby 
SPE is being tested in a system with the duplication option.
System Critical 
Percentage Complete:
The ratio of the number of System Critical MOs tested to the 
number of System Critical MOs left to test. This number is 
displayed for the current testing period as well as the previous 
testing period. System critical resources are considered 
imperative to test, and are tested first (for example, Processor).
Shared Percentage 
Complete:
The ratio of the number of Shared MOs tested to the number of 
Shared MOs left to test. This number is displayed for the 
current testing period as well as the previous testing period. 
Shared resources are resources that are used by more than 
one user, and are tested after system critical resources (for 
example, Trunks).
Single User 
Percentage Complete:
The ratio of the number of Single User MOs tested to the 
number of Single User MOs left to test. This number is 
displayed for the current testing period as well as the previous 
testing period. Single User resources are resources that are 
used by a single user only, and are tested after shared 
resources (for example, Voice Stations).
Start Time of Current 
or Previous Cycle:
For both periodic and scheduled maintenance if any of the 
three levels of MOs are active, then the time the System Critical 
MOs started for this current cycle is shown. If, however, none 
of the MO levels are currently being tested, then the start time 
for previous completed cycle is shown.