Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids 
Page 8-632
test pkt 
8
For the following output example, the command test packet-control 1B was 
entered. Note that carrier B is the active carrier in these example outputs.
For the following output example, the command test packet-control 1A was 
entered. Note that carrier A is the standby carrier in these example outputs.
Feature Interactions
The reset packet-control test (586) does not run on the active packet-control. 
This test is part of the standby packet-control test sequence as illustrated in the 
Output section of this manual page.
test pkt
This command will test the Packet bus on the specified PPN or EPN.
Synopsis
test pkt port-network pn number 
[ short | long ][ repeat number | clear ] schedule
 
 test packet-control 1B
 
                              TEST RESULTS
 
  Port    Maintenance Name  Alt. Name Test No.  Result      Error Code
  01B     PKT-CTRL                      585      PASS
 Command successfully completed
 
 test packet-control 1A
                              TEST RESULTS
 
  Port    Maintenance Name  Alt. Name Test No.  Result     Error Code
  01A     PKT-CTRL                    586       PASS
  01A     PKT-CTRL                    583       PASS
  01A     PKT-CTRL                    585       PASS
 Command successfully completed