Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Routine Maintenance Procedures 
Page 5-4
TN790 Processor Circuit Pack (Memory) 
5
EPN Expansion Interface Circuit Packs
If the system has high or critical reliability, verify that the Expansion Interface to 
be unseated or replaced is NOT a part of the Active Expansion Interface Link. 
Issue the 
status system
 command. If the Expansion Interface circuit pack is 
shown to be a part of the Active Expansion Interface Link, use the 
set 
expansion-link PCSS
 command to make the current Standby link the Active 
one.
EPN Tone-Clock Circuit Packs 
If the EPN has redundant Tone-Clock circuit packs, make sure the Tone-Clock to 
be unseated or replaced is the Standby circuit pack. Issue the 
status system
 
command. If the Tone-Clock is shown as Active, use the 
set tone-clock PC
 
command to make the current Standby Tone-Clock the Active one.
TN790 Processor Circuit Pack 
(Memory)
Unless upgrading memory, the TN790 must have the same number of SIMMs as 
the replaced circuit pack.
!
CAUTION:
Be sure to use a Lucent Technologies-provided SIMM. Other brands may 
have incompatible edge connectors and could produce unpredictable 
results.
Removing Power
When power is removed, the following features deactivate:
Attendant Trunk Group Control
Automatic Callback
Call Park
Make Busy for Direct Department Calling (DDC) and Uniform Call 
Distribution (UCD)
The procedures for removing power vary depending on the system configuration. 
Before performing these activities, refer to the following appropriate procedure.
!
WARNING:
Before powering down a cabinet or carrier that contains DEFINITY AUDIX 
circuit packs (TN566), first power down the AUDIX unit to avoid damaging 
the AUDIX software. Instructions for powering down this unit are in the